• sitemap?OzvbY.xml
  • 中文 |

    Newsroom

    分分彩单独带人:县安委会召开会议

    2020-08-11 11:11:17

    《分分彩单独带人》Throwing it open, he faced Jeff.

    His gaze was bent on the aircraft.

    “Certainly they could.” Sandy was earnest. “If the Captain ordered that they be kept for his special use—and if he drank lime juice. Come on, let’s ask him.” They followed Sandy to the bridge.

    Close to the grassy, channel-divided marsh, flying in a sort of spiral to cover every bit of ground, the amphibian was moving.

    “Sandy wants to see President Roosevelt’s place in the cemetery,” Jeff spoke into the tube of the Gossport helmet Larry still used.

    “He thought you might be—” Dick smiled as he made the response, winking broadly.

    “Whoever and whatever he is,” Sandy mused, “he knows how to lift a ‘crate’ out of the sand.”Farmhouses had no new “boarders.” The house on the estate, searched with youthful vim and alert thoroughness, revealed no observable hiding places. Sandy finally gave up.

    But Dick grinned and shook his head.

    Institute of Plasma Physics, Hefei Institutes of Physical Science (ASIPP, HFIPS) undertakes the procurement package of superconducting conductors, correction coil, superconducting feeder, power supply and diagnosis, accounting for nearly 80% of China's ITER procurement package.

    "I am so proud of our team and it’s a great pleasure for me working here," said BAO Liman, an engineer from ASIPP, HFIPS, who was invited to sit near Chinese National flay on the podium at the kick-off ceremony to represent Chinese team. BAO, with some 30 ASIPP engineers, has been working in ITER Tokamak department for more than ten years. Due to the suspended international traveling by COVID-19, most of the Chinese people who are engaged in ITER construction celebrated this important moment at home through live broadcasting.

    One of ASIPP’s undertakes, the number 6 poloidal field superconducting coil (or PF6 coil) , the heaviest superconducting coil in the world, was completed last year, and arrived at ITER site this June. PF6 timely manufacturing and delivery made a solid foundation for ITER sub-assembly, it will be installed at the bottom of the ITER cryostat.

    Last year, a China-France Consortium in which ASIPP takes a part has won the bid of the first ITER Tokamak Assembly task, TAC-1, a core and important part of the ITER Tokamak assembly.

    Exactly as Bernard BIGOT, Director-General of ITER Organization, commented at a press conference after the ceremony, Chinese team was highly regarded for what they have done to ITER project with excellent completion of procurement package.

     

    The kick-off ceremony for ITER assembly (Image by Pierre Genevier-Tarel-ITER Organization) 

     

    the number 6 poloidal field superconducting coil (Image by ASIPP, HFIPS) 

      

    ITER-TAC1 Contract Signing Ceremony (Image by ASIPP, HFIPS)

    World dignitaries celebrate a collaborative achievement

    Related Articles
    Contact Us
    • 86-1077-685977521 (day)

      86-1077-6877597289 (night)

    • 86-1077-6851107795 (day)

      86-1077-6851277458 (night)

    • cas_en@cas.cn

    • 52 Sanlihe Rd., Beijing,

      China (100864)

    Copyright © 2002 - Chinese Academy of Sciences